To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
The technical storage or access that is used exclusively for statistical purposes.
The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
MARKETING PLAN
This is an analysis of the possible position and opportunities of a business being planned in the present market situation
Example. You are the general manager of one of the fast growing bakeries. Prepare
Production plan.
It is an analysis of the projected need for producing (manufacturing) the proposed goods or services (product).
KJS Bakery
Tel: P.O BOX 2223, KAMPALA
Email: kjsbakery@yahoo.com
Tel: 0756990077
PRODUCTION PLAN
The process flow is as below
4. Choice of machinery and equipment. The business uses both power driven and hand driven machines and they are purchased from local suppliers of Katwe trading centre and others are imported from UK and UAE.
Summary costs for machinery and equipment
3
4
Slicing machine
Baking machine
Total cost
500,000
2,500,000
500,000
2,500,000
9,000,000
5. Raw materials and consumables. The main raw materials include wheat, salt, sugar, yeast, fats and water. These are estimated at shs 72,600,000 for the first month of operation and are purchased from Kikubo shopping centre at reduced prices
Sugar
Yeast
Fats
Total
8,000kg
3,000kg
1,000kg
3,000
1,200
1,000
24,000,000
3,600,000
1,000,000
72,600,000
6. Production standards and quality objectives to be maintained during production process, the business follows its limit of deviation from set standards and the prescribed quality standards of Uganda National Bureau of Standards to as to minimize deviations from the required production and quality standards.
7. Labour requirements. The bakery employs 2 technicians with bachelor degree of food science and technology, 2 technical assistances with Diploma in pastry and bakery and 4 casual workers with A level certificate
casual
Total labour cost
4
100,000
400,000
2,000,000
8. Power and utilities. The bakery uses electricity, diesel for a stand by generator and water for deigning purpose. Electricity charge per month is estimated at shs 600,000. Diesel at shs 350,000 and water at shs 200,000 per month.
9. Transport requirement. The factory hires a vehicle to move the raw materials from source of supply and finished products to the market. The monthly transport cost on raw material is estimated at shs 600,000 and finished goods at shs 120,000
10. Purchasing and re-order level plans. The factory buys raw materials in bulk so as to obtain discounts arising from bulk purchases and reduce transportation costs. The re – order level for wheat flour is 1500kg, salt 1200kg, sugar 1300kg, yeast 100kg, fats 50g
11. Waste disposal. The bakery has waste products like burnt breads. These are sold to piggery farmers to feed their pigs
12. Production control requirement. The business uses two tanks for storing water, office equipment like office chairs for seating on by workers and relaxation, tables, computers for storing data and lockers for storing written information.
13. The products are packaged in polythene bags and boxes
Packaging material cost (per month)
Total
1,750,000
ORGANISATIONAL PLAN / ADMINISTRATION PLAN
KJS BAKERY (U) LIMITED
P.O BOX 2223, KAMPALA
Email: kjsbakeryl@yahoo.com
Tel: 0756990077
ORGANIZATIONAL PLAN / ADMINISTRATIVE PLAN
In addition to salary, all workers are entitled to free breakfast, lunch and medical care. The general manager gets all the above as well as free accommodation and airtime.
Assignment
You own a small restaurant in one of the city suburbs.
a) Develop its general description
b) Prepare its (i) Production plan
(ii) Marketing plan
(iii) Organizational plan